This is an experimental report containing PRs for tag 'ehci' as of 5-30-2014. GNATS has no finer-grained categorization than 'kern', 'bin', 'ports', and so forth. To augment this, the bugmeisters have adopted the convention of adding '[<tagname>]' to the Synopsis field. Consider this a prototype of a better search function.

This report is generated statically.

Please give feedback on this report to linimon@FreeBSD.org. Thanks.


PRs for tag 'ehci':
SSubmittedTrackerResp.Description
o2013/03/13usb/176913usb[ehci] High interrupt load with ehci
o2011/04/23usb/156596usb[ehci] Extremely high interrupt rate on ehci/uhci IRQ16 80% cpu utilization on CPU0
o2010/11/09usb/152075usb[usb8] [ehci] [request] Add quirk for CS5536 USB
o2009/12/23sparc64/141918sparc64[ehci] ehci_interrupt: unrecoverable error, controller halted (sparc64)
o2008/04/07usb/122547usb[ehci] USB Printer not being recognized after reboot
o2007/08/10usb/115400usb[ehci] Problem with EHCI on ASUS M2N4-SLI
o2006/01/17usb/91906usb[ehci] [hang] FreeBSD hangs while booting with USB legacy support on (MSI 865PE Neo2-P)
o2005/05/29usb/81621usb[ehci] [hang] external hd hangs under load on ehci
8 problems total.

Bugs can be in one of several states:

o - open
A problem report has been submitted, no sanity checking performed.
a - analyzed
The problem is understood and a solution is being sought.
f - feedback
Further work requires additional information from the originator or the community - possibly confirmation of the effectiveness of a proposed solution.
p - patched
A patch has been committed, but some issues (MFC and / or confirmation from originator) are still open.
r - repocopy
The resolution of the problem report is dependent on a repocopy operation within the CVS repository which is awaiting completion.
s - suspended
The problem is not being worked on, due to lack of information or resources. This is a prime candidate for somebody who is looking for a project to do. If the problem cannot be solved at all, it will be closed, rather than suspended.
c - closed
A problem report is closed when any changes have been integrated, documented, and tested -- or when fixing the problem is abandoned.