Skip site navigation (1)Skip section navigation (2)

Site Navigation

PRs for tag 'ohci'

This is an experimental report containing PRs for tag 'ohci' as of 5-25-2012. GNATS has no finer-grained categorization than 'kern', 'bin', 'ports', and so forth. To augment this, the bugmeisters have adopted the convention of adding '[<tagname>]' to the Synopsis field. Consider this a prototype of a better search function.

This report is generated statically.

Please give feedback on this report to linimon@FreeBSD.org. Thanks.


PRs for tag 'ohci':
SSubmittedTrackerResp.Description
f2009/09/16usb/138882usb[ohci] [panic] [usb67] Can't install FreeBSD 7.2 due to ohci panic
o2008/04/07usb/122539usb[ohci] [panic] AnyDATA ADU-E1000D - kernel panic: ohci_abort_xfer: not in process context
f2007/01/17usb/108056gavin[usb67] [ohci] Mouse gets powered off during probe when plugged into second ohci-controller
o2007/01/11usb/107827usb[usb67] [ohci] [panic] ohci_add_done addr not found
f2006/08/05usb/101448gavin[usb67] [ohci] FBSD 6.1-STABLE/AMD64 crashes under heavy USB/OHCI load
o2006/02/25usb/93828usb[ohci] [panic] ohci causes panic on boot (HP Pavillion d4100e)
6 problems total.

Bugs can be in one of several states:

o - open
A problem report has been submitted, no sanity checking performed.
a - analyzed
The problem is understood and a solution is being sought.
f - feedback
Further work requires additional information from the originator or the community - possibly confirmation of the effectiveness of a proposed solution.
p - patched
A patch has been committed, but some issues (MFC and / or confirmation from originator) are still open.
r - repocopy
The resolution of the problem report is dependent on a repocopy operation within the CVS repository which is awaiting completion.
s - suspended
The problem is not being worked on, due to lack of information or resources. This is a prime candidate for somebody who is looking for a project to do. If the problem cannot be solved at all, it will be closed, rather than suspended.
c - closed
A problem report is closed when any changes have been integrated, documented, and tested -- or when fixing the problem is abandoned.