last updated: Mon Feb 27 01:10:47 UTC 2012 current tasklist for Redwood City systems (more or less in priority order) Priorities for on-site: - (A3) replace netra2 hard drive. Dead. - (A2/A3/B2) ensure that our fastest machines are all on 1G ethernet. A2/38 has 24 1G ports, B2/26 has 8 1G ports. pointyhat-west, beefy*, coverity, dynode, fif*, hobson* need to be on these (16 required in all). baytech*, cs1, danner, netra*, rockport, thunder* don't talk 1G: A3/39 is 16 10/100; B2/25 is 24 1/100 with one 1G for uplink; they can be used "however". All these switches are unmanaged, so swap at-will. (may have already been done) Nice-to-have for on-site: - (B2) see if we can figure out what hobson9's problem is. Will need power re-added. - (B2) figure if hobson5 has two drives. If so, the second one is dead. - (A3) netra2 does not need its da1 disk (da0 is 32G). - (A3) netra9 does not need its da1 disk (da0 is 32G). - (B2) hobson1 and 2 needs their BIOS set to 'serial redirect'. Tasks that require other people to do something: - long-term plan to move systems out of B2 and into A1, and at the same time standardize on APCs. Requires legal paperwork. Things that can be done offsite: - (A2) the new machine 'beefy1' did not find all 96G of its RAM the very first time it booted. XXX probably renamed to beefy4. Seems to be transient. linimon to monitor. - (A3) the processor in netra6 has died. linimon will send a spare. - (B2) order more RAM for the hobsons, if we think it is worth it. (Items added to wantlist on freebsd.org.) - (B2) order new power controllers.